As soon as extra, Eskom has utilized stage 2 loadshedding.
Alexandria, Bathurst, Port Alfred, Kleinemonde and Kenton-on-Sea will all be field to the same time desk.
- Wednesday March 10 – Loadshedding begins at 11pm so areas unaffected
- Thursday March 11 – 3am to 5.30am and 11am to 1.30pm
- Friday March 12 – 11am to 1.30pm and 7pm to 9.30pm
Can also nonetheless the time desk exchange TotT will retain you up-to-date.